DE150 PVC Drift Eliminator For Cooling Towers
Détails sur le produit:
| Lieu d'origine: | Jiangsu, Chine |
| Nom de marque: | XL |
| Certification: | SGS |
| Numéro de modèle: | XL-120-LJ |
Conditions de paiement et expédition:
| Quantité de commande min: | 10 mètres carrés |
|---|---|
| Prix: | $20-30/square meters |
| Détails d'emballage: | En bois, cartons, paquet fait sur commande |
| Délai de livraison: | 10 jours ouvrables |
| Conditions de paiement: | Western Union, T/T, MoneyGram, D/P, D/A, L/C |
| Capacité d'approvisionnement: | salaire 1000m2/per |
|
Détail Infomation |
|||
| Matériel: | PVC, PP, | Type de refroidissement: | Pièces de tour de refroidissement |
|---|---|---|---|
| Garantie: | 1 an | Nom: | Éliminateur de dérive DE150 PVC pour tours de refroidissement |
| Profondeur: | 120 mm | Longueur: | 1220/1830/2440mm/customized |
| Espacement de feuille: | 20 mm | Usage: | Tour de refroidissement |
| MOQ: | 10 mètres carrés | Épaisseur: | 0,6 mm |
| Nom du produit: | Suppresseur de dérive | ||
Description de produit
DE150 PVC Drift Eliminator For Cooling Towers
![]()
Description:
Drift Eliminators, made out of rigid PVC, are designed to remove entrained particles from air steam efficiently, with minimum pressure drop, thereby reducing the fan power requirement when the air passes through the Drift Eliminator. Water droplets are separated from the air drift at the three direction change points on the drift eliminator.For Cross flow tower applications, the almost vertical water conduits provided by the DE drift eliminator remove the water droplets out of the drift eliminator area and return them back into the tower and does not allow any re-entry.The special locking pin arrangement for DE facilitates quick and simple assembly at site.
Specifications:
| Tech Date | |
| Sheet Width(mm) | 150/120mm |
| Sheet Length | 1220/1830/2440mm/customized |
| Thickness | 0.6-1.2mm/customized |
| Sheet Spacing | 20mm |
| Color | black |
![]()
![]()
![]()
Related Blade Drift Eliminator
Drift eliminator advantages:
1. Maximum drift capture through efficient design
2. Light weight
3. Easy to handle, lift and remove for inspection and service of water distribution system and heat transfer surface (fill and coil)
4. Nested modules to guarantee watertight seam
5. Corrosion free
6. Perfect fit: model specific size kits
PACKING AND DELIVERY
![]()
Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.
Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.
Vous voulez en savoir plus sur ce produit




